Case Study: Bartlett Boulevard

Text/HTML

Case Study Overview

Project: Bartlett Boulevard
Location: Bartlett, TN, United States
Project Type: Slope Stabilization
Application: Shallow Plane Slope Structural Reinforcement
Product Used: ARMORMAX®

Photo showing erosion and slope failure along Bartlett Boulevard caused by heavy rain events.

Problem

Heavy rainfall in Bartlett, Tennessee caused slope instability along Bartlett Boulevard. City of Bartlett Engineering Department sought a low impact, vegetated solution to stabilize the steep roadway slope for shallow plane slope failure reinforcement.

Solution

Propex worked with the City's Engineering Department to model and design slope stabilization using the ARMORMAX® 75 system, and provided installation assistance in 2013 for the successful completion of the project.

Photo showing ARMORMAX 75 installation along Bartlett Boulevard roadway slope.

Solution

 

Photo showing ARMORMAX 75 vegetated engineered slope stabilization solution along Bartlett Boulevard.

Performance

ARMORMAX® 75 was designed and installed for deep slope stability while providing significant time and cost savings over hard armor solutions.


Visit the ARMORMAX® product page to learn more about this Propex® GeoSolutions product.