Case Study: Bio-Retention Pond NC DOT

Text/HTML

Case Study Overview

Project: Bio-Retention Pond NC DOT
Location: New Bern, NC, United States
Project Type: Shoreline Reinforcement
Application: Erosion Control
ProductS Used: ARMORMAX® and PYRAMAT®

Photo showing uplift from storm surges by hurricanes causing erosion along the river.

Problem

The Neuse River in Newbern, NC was experiencing frequent storm surges from hurricanes, so the NC DOT Hydraulics Unit was charged with creating a Storm Water Best Management Practice (BMP). A water quality bio retention swale needed to be constructed, and to do this a 6 foot berm needed to be build next to the river. The durability of the berm ws a concern and rock rip rap would not provide adequate strength.

Solution

ARMORMAX® 75, consisting of PYRAMAT 75 High Performance Turf Reinforcement Mat in combination with Engineered Earth Anchors™, was chosen and installed, preventing erosion from the shear stress of the river, as well as uplift from tidal surges and overtopping.

Photo showing ARMORMAX 75 locking the soil in place and protecting against hydraulic stresses.
Photo showing completed installation of ARMORMAX 75, which protected the berm from the impact of Hurricane Isabell.

Performance

ARMORMAX® held up, even after taking a direct hit by Hurricane Isabell, protecting the berm with no damage.


Visit the ARMORMAX® product page to learn more about this Propex® GeoSolutions product.
Printable Case Study PDF
Product Data Sheets
Additional Case Studies Featuring ARMORMAX®