Case Study: Phase I - Mar Bella Community Association Inc.

Text/HTML

Case Study Overview

Project: Phase I - Mar Bella Community Association Inc.
Location: League City, TX, United States
Project Type: Shoreline Reinforcement
Application: Pond Bank Stabilization
Product Used: ARMORMAX® 75

Photo showing pond bank erosion and sloughing due to wave action.

Problem

Mar Bella is a 531 acre community near Galveston Bay boasting 40 acres of lakes and ponds. Despite a shoreline retaining wall, one of the community ponds was losing shoreline due to erosion from persistent wind-generated waves. This loss of shoreline meant property loss for homeowners.

Solution

Mar Bella's consulting engineer approached Propex for a permanent and cost effective solution. ARMORMAX® 75 Engineered Earth Armoring Solution™ was chosen because it offered a lower cost solution than traditional hard armoring solutions and yielded a vegetated outcome that is more aesthetically pleasing than rock rip rap.

Photo showing ARMORMAX installation along the pond bank.
Photo showing permanently stabilized, aesthetically pleasing pond banks.

Performance

ARMORMAX® 75 provided permanently stabilized, aesthetically pleasing pond banks and was installed quickly with minimal disturbance to the surrounding area


Visit the ARMORMAX® product page to learn more about this Propex® GeoSolutions product.