Case Study: Regal Marine

Text/HTML

Case Study Overview

Project: Regal Marine
Location: Orlando, FL, United States
Project Type: Shoreline Reinforcement
Application: Shoreline Restoration — Erosion Control
Product Used: ARMORMAX®

Photo showing failing bank threatening risk of loss to property.

Problem

Failing banks in the area of the canal where Regal Boats test drives their watercraft was causing a risk of loss to property.

Solution

In order to save time and money, the ARMORMAX® 75 system was utilized. ARMORMAX® 75 consists of a High Performance Turf Reinforcement Mat (HPTRM) and Engineered Earth Anchors to protect and maintain usable property.

Photo showing ARMORMAX 75 installation on slope.

Solution

 

Photo showing soft vegetated protection system for marine showcase pond.

Performance

The project was successfully installed and is performing as expected with a soft, vegetated protection system for a marine showcase pond.


Visit the ARMORMAX® product page to learn more about this Propex® GeoSolutions product.
Printable Case Study PDF
Product Data Sheets
Additional Case Studies Featuring ARMORMAX®